Sampling, Analysis and Bioassessment of Freeport Harbor Inside Channel and Basins, Brazoria County, Texas

This project consisted of Marine Protection, Research, and Sanctuaries Act of 1972 (MPRSA) Section 103 sediment sampling, analysis, and assessment in support of maintenance dredging the Freeport Harbor inside channel and basins in Brazoria County, Texas. 

The project area was the Freeport Inner Basin area and the Gulf Intracoastal Waterway extending from Freeport Harbor to the Brazos River.  Field sampling was conducted in October 2017 and consisted of collecting sediment and water samples for physical, chemical, toxicological, and bioaccumulation analysis.

Areas to be dredged were divided into five project-specific dredged material management units (DMMUs) with three sediment samples and one site water sample collected per DMMU.  Each DMMU was expected to have relatively consistent characteristics.  Sediment samples from each DMMU were composited and homogenized to create one composite per DMMU.  Sediment samples were also collected from the Freeport Harbor Maintenance ODMDS placement area as well as the reference area. 

ANAMAR coordinated and directed field operations and worked closely with USACE and EPA to perform sample collection and laboratory analysis.  ANAMAR reviewed all data and produced a report, finalized in July 2018, summarizing the results of the physical, chemical, toxicological, and bioaccumulation analysis of samples.  Following report completion, USACE received concurrence from EPA Region 6 for ocean disposal of the dredged material.

Accomplishments

  • Collected all sediment and water samples while adhering to protocols that ensure sample integrity
  • Worked closely with the labs and USACE to ensure that analytical milestones were met on schedule and in accordance with guidance documents
  • Submitted a sediment analysis report on schedule and met all necessary objectives
  • USACE obtained concurrence from EPA in late 2018 that the dredged material was suitable for ocean disposal

©2006-2016 ANAMAR Environmental Consulting, Inc. | Web design provided by Blu Dove Designs

Gainesville, FL (352) 377-5770
Portland, OR (503) 220-1641
Fax: (352) 378-7620 • This email address is being protected from spambots. You need JavaScript enabled to view it.